Friday, February 14, 2014

Week 6-Friday-Valentine's Day and Tilly's 7TH Birthday

We had a lot going on today. The painter arrived shortly after 8 this morning to do some touch up so he would be out of the way for when the granite arrived.


 The granite arrived about 9:30.


A 5 x 7.5 foot slab weighs about 1300 lbs. 7 guys (one you can't see). They decided the best way to get it in the house was through the french doors off the kitchen,
                                                  
                                         
Getting it positioned on the island

Galen, Greg (contractor) and our neighbors Colleen and Chris
Next came the solid black granite counter tops. This is the
long piece where they need to cut for the stove top insert

Doing just that! Someone is cutting and someone has a vacuum
This is the granite top for the 1/2 bath.

Decided to go with a white vessel sink


Counter tops are in!

Tilly had to check things out.  They have access now, the plastic is off the doorways

I finally get a sink in my laundry room! And lots of cabinets!


The Butler's Pantry
The same granite as on the big island. Tiki is checking things out!






Another view of the island


The black granite tops

All the drawers and a few doors and panels waiting to find their place!


Next week on Tuesday they start with the back splash, floor and the small 
porch at our front entry way!







1 comment:

  1. I love your kitchen! Wish mine was that size. I better show these photos to my husband and maybe the kitchen will get done.

    ReplyDelete

  End of March 2024!   poodlegirls     cooking ,  Daily Happenings ,  Donation Quilting ,  Life at home ,  Nature ,  Our Girls ,  Quilting ,...