Nailing the board to the sub floor.
After they got all that done they set up their equipment outside to cut the travertine tile into the correct sizes
Took this picture from the 2nd floor window. It was hot but at least he was able to work in the shade of our live oaks
Peter did all the cutting outside. His helper got to carry all the cut pieces up the steps. I think his helper had the rough part of the job today. He made lots of trips up and down!
At the end of the day there were several stacks of different cut pieces outside of each bathroom
Before they left the put leveling compound on the low spots.
More big pieces of travertine and all the grout. Ready for Thursday.
They will arrive between 8 and 8:30 to start. About 9 someone will be coming to measure the railings for upstairs and show us our options. Another busy day.